| 1 |
Corridor work of Construction of Bemetara Bypass Section (from km 290.747 to km 295.180) of NH-30 (Erstwhile NH-12A) to 4-lane with service lanes in the State of Chhattisgarh through EPC basis. |
In Progress |
| 2 |
Construction of Road Over Bridge (ROB) at R-VZM Branch line connecting Road No. 2 and NH-53 at Nava Raipur Atal Nagar Dist. Raipur (C.G.) |
In Progress |
| 3 |
Construction of Saja- Bortara- Parpodi Road (Bijagond- Parpodi Road Length 12.325 K.M. Including Bridges culverts At Distt.-Bemetara (C.G.) |
In Progress |
| 4 |
Rehabilitation and up-gradation of Bihrikala-Dangad-Somatola-Khadgaon ( Package 09 ) Under Group-B Roads at Rajnandgaon in the State of Chhattisgarh (ADB 39.17 Kms). |
Completed |
| 5 |
Rehabilitation and up-gradation of Dongargaon-Khujji-Pinkapar-Jevartala Road ( Package 11 ) Under Group-B Roads at Rajnandgaon in the State of Chhattisgarh (ADB 23.42 Kms). |
Completed |
| 6 |
Upgradation of ACC Jamul chowk to Nandini Ahiwara road, ( Length - 21.850 Km ) in Distt. Durg. |
Completed |
| 7 |
Improvement of Crust & Strengthening Work of Raipur- Durg 4-Lane (Including Improvement of Junction) In Km.281.00 to Km 307.600, of N.H.53(Old N.H.06) In Chhattisgarh States |
Completed |
| 8 |
Rehabilitation and up-gradation of NH-43 from Km 173.00 to Km 183.00 (Kanker to Bedma Section) to two lane with paved shoulder in the State of Chhattisgarh under NHDP-IV through Engineering, Procurement & Construction (EPC). |
Completed |
| 9 |
Construction and maintenance of RCP LWE Kondagaon RD 0.00 KM to 51.00 KM Road Package No- CG26-04 |
Completed |
| 10 |
Construction of Dholiya Kosa Chandanu Road Length 16.325 K.M. including Bridges & culverts At Distt.- Bemetara (C.G.) |
Completed |
| 11 |
Widening & Stregthening Of Bhansuli to Khamariya Road (L. 9.60 KM) I/C. Culverts At Dist. Durg Chhattisgarh. |
Completed |
| 12 |
Construction and maintenance of RCP LWE Kondagaon NH 43 RD 194 to Chiyanar Road Package No- CG2605 |
Completed |
| 13 |
Construction & Maintinance of Rural Road Under PMGSY-III Batch-I PKG No CG 05-95 Distt.- Durg. |
Completed |
| 14 |
Construction Of Chaturdik Roads At Patan In Patan Vidhansabha Length 6.60 K.M. AT DISTT. DURG. |
Completed |
| 15 |
Construction of Sikola Sonpur Approach Road Length = 2.80 Km And Sikola Sipkonha Approach Road Length = 3.50 Km Total Length 6.30 Km (Group Tender) Dist. Durg |
Completed |